Acquisition of land in Andalusia

What to take into account when buying land in Andalusia

It depends on several factors. The coastal regions of Málaga, Cádiz, Huelva and Marbella are especially sought after, generating a high demand for land. However, you will also benefit from a stable real estate market and potential appreciation in the value of your property. Another advantage of building a house is that you can design it according to your individual preferences.

How to find the right land?

There are several ways to find suitable land in Andalusia. You can search online listings on portals, buy directly from the owner or from local suppliers on the site, or consult a professional advisor who can help you with the search and purchase of the land and provide you with information on the legal aspects.

However, before purchasing the right land, there are certain things to consider. A land analysis must be carried out to assess suitability for construction and legal regulations for a construction project within the municipality. This analysis is carried out by an architect and takes into account the location, size and characteristics of the land.

How can the correct criteria be considered when analyzing a piece of land?

Location factors: What is the accessibility, infrastructure, environment and neighborhood like?

Shape, Size and Orientation of the Land: What are the proportions, location and available area?

Building Standards: What standards, floor area ratios, and setback requirements must be met?

Land characteristics: What is the quality of the soil like? Are there potential environmental issues or development costs to consider?

What documents are necessary for a comprehensive analysis of the territory?

A site plan indicating the construction area.

Plans and sketches of the planned structure, if available.

One or two informative photographs of the terrain.

Information on building regulations and the urban plan.

Costs to consider when buying land in Andalusia?

The deadline for obtaining a construction permit depends on several factors:

  1. La ubicación y tamaño del terreno: Los precios pueden variar según la región y la demanda.
  2. El permiso de construcción y el proyecto: Algunos terrenos se venden con un permiso de construcción existente y planos del proyecto completos.
  3. Costos e impuestos adicionales: Al comprar un terreno, debes tener en cuenta los costos adicionales como los honorarios de notario y abogado, que pueden rondar el 3% del precio de compra. Además, tendrás que pagar impuestos como el Impuesto de Transmisiones Patrimoniales (ITP) o el Impuesto sobre el Valor Añadido (IVA).

Dependiendo del precio de compra del terreno, los honorarios de notario y abogado pueden representar alrededor del 3%. El impuesto sobre transmisiones patrimoniales (ITP) oscila entre el 8 y el 11 por ciento, mientras que el impuesto sobre el valor añadido (IVA) para un terreno edificable, en el caso de una venta por parte de una empresa, es del 21 por ciento.

¿Cuánto tiempo lleva obtener un permiso de construcción?

The deadline for obtaining a construction permit depends on several factors:

1. The type and size of the construction project, whether new construction, renovation or expansion.

2. The competence and workload of the municipality, since each municipality has its own regulations and procedures for issuing permits.

3. The integrity and quality of the documentation, since defective or incomplete documents can cause delays.

In Andalusia, obtaining a construction permit usually takes between 6 months and 2 years on average. Therefore, it is advisable to hire an experienced architect or construction company from the beginning, who can take care of all matters and provide regular updates on the process.

How can you obtain a building permit?

When applying for a building permit, you should consider the following points:

Before buying a plot of land, check its suitability for construction and compliance with regulations. It is advisable to gather information on building permit and building regulations before purchasing a plot of land and possibly submit a preliminary investigation to the municipality. After obtaining the building permit, you must pay within 60 days and within 6 months you must submit the execution plan. Construction should begin another 6 months later. Failure to do so may result in the permit expiring or being revoked. In addition, you must comply with the provisions of the permit and avoid making changes without approval. Building without a permit or violating building regulations can result in heavy fines or even demolition. Enforcement of regulations has become stricter in recent years. It is therefore advisable to comply with building regulations. Our company is happy to accompany you from finding the plot of land to handing over the keys for a new build, renovation or project management. We emphasize proven construction quality and consider building physics adapted to the climatic conditions of Andalusia.